The work stream to build the new clinical dental teaching facility and student hub on the Blantyre campus of Kamuzu University of Health Sciences took a further step forward on Friday 11th April 2025, when the site was handed over to the building contractor, Mango Tree Construction Company. The agenda for the event was as follows:

The delegates assembled initially in the ICT Board Room:

Prof Chisomo Msefula, Lead for the KUHeS SAVE Project, addressing the group

Dr Peter Chimimba, Malawi Lead for The MalDent project, provided the background and context to the building:

Peter addressing the delegates

In his presentation, Peter stressed how critical the new facility is to the ongoing viability of the Bachelor of Dental Surgery programme at Kamuzu University of Health Sciences and the added value it will bring to the university and the local community.

Peter making his point!

It was very appropriate that three of the BDS academic staff were present to witness the handover of the site:

L-R: Drs James Mchenga, Nathan Lungu and Tasneem Chikwatu from the Department of Oral Health Sciences

The Deputy Vice Chancellor was represented by the University Librarian, Mr Diston Chiweza, who made remarks on her behalf:

Mr Diston Chiweza addresses the delegates on behalf of the Deputy Vice Chancellor

The contracts were then officially exchanged and the site handed over:

Contracts exchanged

Following the formalities in the Board Room, the delegates left to visit the site of the new facility…

Heading out to the site

… with various discussions along the way …

James Mchenga and Peter Chimimba look on as Peter Creaser (architect) and Soobhas Sobnack (engineer) have a chat

… until the site was finally reached:

Viewing the site

A final photograph was taken at the demonstration wall that had been constructed to the specification produced by Leon Grobbelaar from John McAslan + Partners during his visit in 2024.

Handshake at the demonstration wall

Peter Chimimba, Mwapatsa Mipando and I had been very excited last year to see this demonstration wall as, like today’s site handover, it had represented a tangible step forward. It is perhaps reminiscent of the famous quote by the architect Louis Kahn (1901 – 1974):

Even a brick wants to be something more than it is

The following aerial view with a superimposed perimeter of the site (blue line) gives some idea of the scale of the new facility:

Finally, to really bring things to life, a white line has been drawn to demarcate the boundary before physical barriers are erected.

A meaningful thin white line

At last, it feels as though the building is becoming a reality!

2 thoughts on “Another important step – handover of the site of the new dental teaching facility / student hub to the contractor

  1. Another uplifting blog Jeremy on this important milestone of the journey. Well done to all concerned. Having been at KUHeS this morning, it is indeed a very tangible milestone. 👏👏👏👏🥂🥂🥂

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.